-
The complexity of CO-agent scheduling to minimize the total completion time and total number of tardy jobs
Author: Rubing Chen, Jinjiang Yuan, Yuan Gao
Journal: JOURNAL OF SCHEDULING, 2018, Vol., , DOI:10.1007/s10951-018-0598-5
-
A note on reverse scheduling with maximum lateness objective
Author: S. S. Li, P. Brucker, C. T. Ng, T. C. E. Cheng, N. V. Shakhlevich, J. J. Yuan
Journal: JOURNAL OF SCHEDULING, 2013, Vol.16, 417-422, DOI:10.1007/s10951-013-0314-4
-
Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruption
Author: Qiulan Zhao, Jinjiang Yuan
Journal: JOURNAL OF SCHEDULING, 2013, Vol.16, 253-260, DOI:10.1007/s10951-013-0311-7
-
Stochastic scheduling problems with general position-based learning effects and stochastic breakdowns
Author: Yebin Zhang, Xianyi Wu, Xian Zhou
Journal: JOURNAL OF SCHEDULING, 2012, Vol.16, 331-336, DOI:10.1007/s10951-012-0306-9
-
Online scheduling with immediate and reliable lead-time quotation
Author: Feifeng Zheng, Yinfeng Xu, Weimin Ma, E Zhang
Journal: JOURNAL OF SCHEDULING, 2013, Vol.17, 225-236, DOI:10.1007/s10951-013-0363-8
-
A note on the preemptive scheduling to minimize total completion time with release time and deadline constraints
Author: Long Wan, Jinjiang Yuan, Zhichao Geng
Journal: JOURNAL OF SCHEDULING, 2014, Vol.18, 315-323, DOI:10.1007/s10951-014-0368-y
-
Two-machine interval shop scheduling with time lags
Author: Xiandong Zhang, Steef van de Velde
Journal: JOURNAL OF SCHEDULING, 2013, Vol.18, 359-368, DOI:10.1007/s10951-013-0336-y
-
Optimal <Emphasis Type="Italic">K</Emphasis>-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times
Author: Xin Li, Richard Y. K. Fung
Journal: JOURNAL OF SCHEDULING, 2015, Vol.19, 165-176, DOI:10.1007/s10951-015-0448-7